{"status": "missing_lemma", "notes": "Not proved. As the desk's sketch asks, this is a cut, and Lean 4.36 with the prebuilt project accepts the whole reduction (scratch file of about 830 lines, no sorry, axioms propext, Classical.choice, Quot.sound; not attached, since the lean field is for a full proof): the posted statement follows from ONE remaining statement, CORE below. No piece hoists a gate: every move rewrites gates in place, so the gate count never grows.\n\nNotation. n = N+N; e v = List.ofFn fun k : Fin n => decide (k = v); W C x i = (C.wires x).getD i false; zero = List.replicate n false. Spec C: Monotone2 C ∧ ReadsBack n C ∧ C computes the step's function. Bad C j: j < C.gates.length ∧ (gateAt C j).op = and ∧ ∃ v : Fin n, W C (e v) (n+j) = true. mu C = the number of j with Bad C j. Dec C: ∃ C', Spec C' ∧ (C'.size < C.size ∨ (C'.size = C.size ∧ mu C' < mu C)).\n\nProved in Lean, for every C with Spec C:\n(A) If Dec C holds for every C that has a bad gate, the step follows (strong induction on size, then on mu).\n(B) Constants. If some gate is bad and W C zero i = true for some i, then Dec C. Move: each gate t with W C zero (n+t) = true becomes ⟨or, []⟩; every other gate keeps its op and drops the inputs i with W C zero i = true. The least wire true at zero is an AND gate, bad before and an OR after, so mu drops.\n(C) Copy. If Bad C j and some i ∈ (gateAt C j).inputs has W C x (n+j) = W C x i for all x of length n, then Dec C. Move: gate j := ⟨or, [i]⟩.\n(D) Lower. If Bad C j and there is a gate g with g.op = or, g.inputs.length ≤ 2, every input < n+j, such that C with gate j replaced by g still computes the function, and g.op.eval (g.inputs.map (W C x)) = true → W C x (n+j) = true for all x of length n, then Dec C (wires only go down, so no other gate becomes bad). g = ⟨or, []⟩ is the case of a bad gate the output does not need.\n(E) Shape. If no wire is true at zero, j is the least bad index and (C) does not apply at j, then (gateAt C j).inputs = [a, b] with a ≠ b, n ≤ a, n ≤ b, a < n+j, b < n+j, gateAt C (a-n) and gateAt C (b-n) are OR gates, and W C (e v) a = W C (e v) b = true for one v.\n\nCORE (open; the missing lemma). I is C4-free, Spec C, ∀ i, W C zero i = false, no bad gate satisfies (C) or (D), j is the least bad index, and a, b, v are as in (E). Then Dec C. Only (A) uses the conclusion, so mu may be replaced there by any well-founded measure.\n\nCORE is not vacuous: N = 2, I = {(0,0),(0,1),(1,0)}, wires 0,1 points and 2,3 lines, gates 4 = OR(0,1), 5 = OR(0,2), 6 = AND(4,5), 7 = OR(2,3), 8 = AND(6,7), output 8. It computes the function, gate 6 is true at point 0 alone, and every hypothesis of CORE holds (checked by enumeration); Dec holds there because 4 gates suffice.\n\nEvidence, from my own exhaustive search (a C program, not a proof; gates with two distinct inputs and pairwise different functions, which loses nothing at minimum size). For all 26 connected C4-free bipartite graphs with at most 7 vertices and no more points than lines (up to isomorphism; the sides can be swapped), the minimum size over all circuits equals the minimum over circuits with no bad AND gate (sizes 1 to 9), so the step holds for them. For 25 of the 26 (the last, of minimum 9, was too slow) NO minimum-size circuit has a bad AND gate at all. Control: asked for size 5 on the example above, the search does return a circuit with a bad AND. This suggests a stronger CORE worth trying: under its hypotheses C is not of minimum size (C'.size < C.size). The 13 connected graphs with at most 6 vertices that contain a 4-cycle behave the same, so these sizes do not test C4-freeness.\n\nWhere it stands: no proof of CORE. The obstacle is the one the sketch names: with a = x_v ∨ a' and b = x_v ∨ b' the bad gate is a ∧ b = x_v ∨ a'b', and when the OR gates a and b have other readers, computing a'b' and adding x_v costs extra gates; (D) only covers an OR of at most two earlier wires standing in.\n\nSources: the project's definitions at the pinned commit; the rest is my own unreviewed work."}
